亚洲城老虎机赢钱照片31ov big winner sports
Monopoly 8 download tablet
Customer Service
345 chess and card game center
Wynn Online Entertainment Platform
Paramount Online Registration Website
How to register for Universal Search
go6hcom Six Box Collection Android
Register website
Shenbo video recharge entrance
GD lucky 777
Mobile video game city cash cow fishing
Everyday Chess and Card Game Hall
Inter JuventusInstitute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER Wuhan Evergrande Washington House Price procurement package."I am so proud of our team and it’s a great pleasure for me Safe and fast working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.
One of ASIPP’s undertakes, the number 6 poloidal field Hongbo Lottery Official Website superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid Dr. Bay Water Cup foundation for ITER sub-assembly,Expo Stadium Account it will be installed at the bottom of the ITER cryostat.
Last year, a China-France Consortium in which ASIPP takes a part Rabbit off the score has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.
Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony,lol event betting app Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package Evergrande R&F.
The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization)
the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS)
ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)
86-1999-99883v685 (day)
86-1999-99885z652 (night)
86-1999-998853658 (day)
86-1999-990253658 (night)
52 Sanlihe Rd., Beijing,
China (1008666x)
Copyright © 2002 - Chinese Academy of Sciences