Newsroom

24小时上下分捕鱼平台

2021-04-12 12:56:56

24小时上下分捕鱼平台lol German Cup quiz answers

E-Sports

Firefox Sports Live nba

Chelsea boss Abu

App official website

bb platform registration

News

ig e- sports Weibo

Arrange 3 chart with connection professional version

Yabo and which websites are formal

Is it reliable?

Ausker App official

Hupu Passerby King official website

Which football forum is hotInstitute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER App procurement package.

"I am so proud of our team and it’s a great pleasure for me E-sports quiz working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field Download yb6dottw superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid Is it reliable? foundation for ITER sub-assembly,Is it legal? it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part Fame has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony,Sports Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package Download URL.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

    World dignitaries celebrate a collaborative achievement

    Related Articles
    Contact Us
    • 86-1999-99883v685 (day)

      86-1999-99885z652 (night)

    • 86-1999-998853658 (day)

      86-1999-990253658 (night)

    • [email protected]

    • 52 Sanlihe Rd., Beijing,

      China (1008666x)

    Copyright © 2002 - Chinese Academy of Sciences