Newsroom

淘金国际网

2021-04-11 16:42:50

淘金国际网Eleven choose five platform app

Three Eight Entertainment Chess

Changlefang Game Official

Yongxin Entertainment E-sports

lol 竞猜app

500 e-sports app

lol quiz how to press bamboo

ebet live microphone

Premier League Points World Cup

RM room

Penguin e-sports live quiz bet

188BET official website

ag mobile login network

Yaxin Sports AppInstitute of Plasma Physics, Hefei Institutes of Physical Science (ASIPP, HFIPS) undertakes the procurement package of superconducting conductors, correction coil, superconducting feeder, power supply and diagnosis, accounting for nearly 80% of China's ITER Bebo official contact 594yb, cc procurement package.

"I am so proud of our team and it’s a great pleasure for me Fast working here," said BAO Liman, an engineer from ASIPP, HFIPS, who was invited to sit near Chinese National flay on the podium at the kick-off ceremony to represent Chinese team. BAO, with some 30 ASIPP engineers, has been working in ITER Tokamak department for more than ten years. Due to the suspended international traveling by COVID-19, most of the Chinese people who are engaged in ITER construction celebrated this important moment at home through live broadcasting.

One of ASIPP’s undertakes, the number 6 poloidal field Italy vs Uruguay superconducting coil (or PF6 coil) , the heaviest superconducting coil in the world, was completed last year, and arrived at ITER site this June. PF6 timely manufacturing and delivery made a solid Opel app address foundation for ITER sub-assembly,Welcome to 594yb it will be installed at the bottom of the ITER cryostat.

Last year, a China-France Consortium in which ASIPP takes a part Web site cannot be opened has won the bid of the first ITER Tokamak Assembly task, TAC-1, a core and important part of the ITER Tokamak assembly.

Exactly as Bernard BIGOT, Director-General of ITER Organization, commented at a press conference after the ceremony,Is it reliable? Chinese team was highly regarded for what they have done to ITER project with excellent completion of procurement package Act as an agent.

 

The kick-off ceremony for ITER assembly (Image by Pierre Genevier-Tarel-ITER Organization) 

 

the number 6 poloidal field superconducting coil (Image by ASIPP, HFIPS) 

  

ITER-TAC1 Contract Signing Ceremony (Image by ASIPP, HFIPS)

    World dignitaries celebrate a collaborative achievement

    Related Articles
    Contact Us
    • 86-1999-99883v685 (day)

      86-1999-99885z652 (night)

    • 86-1999-998853658 (day)

      86-1999-990253658 (night)

    • [email protected]

    • 52 Sanlihe Rd., Beijing,

      China (1008666x)

    Copyright © 2002 - Chinese Academy of Sciences